Confidential Client, Multi-Building, Data Center AI Liquid-Cooled Rack Test Campus – Texas
Project Overview
- $514 Million Program Value
- 79 MW Campus Electrical System Capacity
- 36,000 RT Cooling Capacity
- Liquid Cooled Racks + Hot-Aisle/Cold-Aisle Containment
- 14 Test Lines
- 493 Rack Test Positions
Summit provided mechanical, electrical, plumbing, technology and controls design of a three-building rack test and assembly campus, delivered in phases to support a rolling production schedule across multiple test lines and two dedicated rack-integration labs. The program combined two brownfield building conversions with one ground-up greenfield facility, all engineered to operate as a single, coordinated test and assembly campus. Summit coordinated with the local utility to provide multiple medium voltage circuits in a very short timeframe. A robust loop medium-voltage distribution system provides a high degree of maintainability and reliability. A bridge-power generation system was sourced by Summit and provided to ensure that utility timelines would not be an obstacle to hitting the end-customer’s demanding timelines for production. The bridge power system fed the campus-wide medium voltage distribution system designed by Summit.
Nine liquid-cooled test lines, ranging from 8 to 60 kW per rack position, are served by stainless-steel technology cooling loop (TCL) mains routed from a central plant through coolant distribution unit (CDU) banks, with per-rack pressure-independent flow control and modulating end-of-line differential-pressure control. Five air-cooled and hybrid lines, spanning 0.5 to 175 kW per position, operate under hot-aisle containment with above-deck fan-coil units and CFD-validated air discharge. Two rack-integration labs add fifteen high-power positions rated from 100 to 400 kW each.
Complex Design Requirements
- Phased campus energization across two converted brownfield buildings and one new greenfield building without disrupting active test lines already in production
- Nine-line liquid cooling architecture on stainless-steel TCL distribution, with per-rack pressure-independent control and modulating end-of-line differential-pressure control to hold performance stable as lines are added
- CFD-validated hot-aisle containment and above-deck fan-coil discharge for five air-cooled/hybrid lines spanning a 350x range in rack density (0.5–175 kW)
- Two high-power rack-integration labs engineered for positions up to 400 kW — among the highest densities in Summit’s rack-test portfolio
- 79 MVA of utility service coordinated and sequenced across three buildings and a rolling multi-customer test schedule
Summit Delivery — Responsiveness That Drives Customer Success
Summit’s team went well beyond the normal scope of an MEP consultant to keep this program on schedule. Summit led major MEP lead-time identification and steel procurement across the campus, developing Long Lead Equipment (LLE) lists with multiple sourcing and pricing options so ownership could sequence procurement to meet an aggressive, rolling delivery schedule. This included Summit sourcing equipment from dozens of global suppliers to find MV transformers, MV switchgear, Switchboards, Chillers and other long-lead equipment to ensure the project could meet it’s aggressive schedule.
Summit’s engineers proactively identified and resolved construction-timeline risks before they became problems — including stepping in to properly permit owner-provided equipment that had not been permitted correctly, and resolving construction-phasing conflicts to maintain safe, clean separation between active construction and live production at every phased building start. That level of responsiveness and dedication is what has allowed Summit’s customers on this program to keep production schedules intact and bring capacity online on time.
Engineering Capabilities
Mechanical
- 36,000+ RT of open-loop chilled-water cooling capacity across the campus’s liquid-cooled lines, with multiple temperature loops
- Central chilled-water plant with primary/secondary pumping, waterside economizer and predictive-staging sequences, phased for campus build-out
- Above-deck fan-coil and fan-filter units with CFD-validated discharge velocity and recirculation-zone studies for air-cooled lines
- Two rack-integration labs engineered for 100–400 kW positions
Electrical
- 79 MVA of coordinated utility service capacity across three phased buildings
- Dedicated per-rack, per-UUT power distribution with pin-and-sleeve receptacle enclosures and contactor-based disconnects for 493 test positions
- Overhead busway and cable tray distribution engineered for rolling test-line turn-on on a live, occupied campus
- Motor control centers and VFD-driven pump arrays serving the central plant
Plumbing
- Stainless-steel TCL supply and return distribution from the central plant and CDU banks to each rack position, with isolation, flushing provisions and instrumentation at every drop
- Per-rack manifold assemblies with pressure-independent or flow-regulating control, flow and temperature sensing, and quick-connects
- Compressed air and process utility distribution supporting manufacturing, assembly and lab operations
- BTU metering, air separation and expansion/fill provisions at the central plant and CDU banks
Technology
- Full BMS integration of chiller-plant, CDU and rack-level points with the customer’s test-rack cooling control system
- Points lists and sequences of operation developed for phased, multi-building commissioning
- “Ready-to-disconnect” indication and control stations in both hot and cold aisles, with interlock and safety-labeling design
- Cable tray, busway and conduit routing engineered with fill calculations, walk-under clearances and no-fly zones