
Total renovation of existing space into a black box theater with theater, lobby, rehearsal space, and scene shop.
The facility included a 150-seat auditorium.
Construction was completed in 2007 and cost was within budget.
Total renovation of existing space into a black box theater with theater, lobby, rehearsal space, and scene shop.
The facility included a 150-seat auditorium.
Construction was completed in 2007 and cost was within budget.