
Target Frozen Distribution Center, Sacramento, California
PROJECT SIZE- 600,000 SF
FEATURES-
12,000k VA power resiliency
More than 1 Megawatt of EV and truck charging capacity
More than 1 Megawatt of shower power capability for electrified refrigerated trucks
PROJECT DESCRIPTION- Summit provided the MEP design for a new 600,000 Square Foot frozen Food distribution center in Sacramento, California. Building features include 12,500kVA Tier-4 emissions compliant on-site generation to ensure product is protected and that operations are never disrupted. Summit’s electrical infrastructure design provides a highly maintainable system, with a focus on resiliency and redundancy to ensure product and operations operate seamlessly for decades to come.